Upper Serpentine Drainage Pump Station |
|
Owner City of Surrey, Vince Lalonde, 604-591-4314 Engineer Completed Value Construction Period |
![]() |
Scope of Work The project involved construction of a stormwater pump station on the bank of the Serpentine River, along with upgrading of the incoming drainage channel. The outlet area was temporarily sheet piled to isolate the excavation from the river, and the concrete structure was supported on precast concrete piles. Two large screw pumps were installed, along with an electrical control building and an overhead power line. |